Photograph as originally submitted to this page in the Historical Marker Database www.HMdb.org. Click on photo to resize in browser. Scroll down to see metadata.
The Glory Hole Marker

Taken: May 8, 2008
Caption: The Glory Hole Marker
Additional Description: Photo captions:
Construction of Whiskeytown Dam and the Glory Hole (right side of photo) began in 1959 and finished in 1963.

Water for Fish — Water from Whiskeytown Lake is released into Clear Creek through special outlets in the dam. These outlets blend the lake’s warmer water (57 F) with its colder, deep water (45 F). This system benefits the salmon and steelhead trout that use Clear Creek as their spawning ground.
Submitted: February 26, 2013.
Database Locator Identification Number: p235198
File Size: 1.499 Megabytes

To see the metadata that may be embedded in this photo, sign in and then return to this page.