Photograph as originally submitted to
this page in the Historical Marker Database
www.HMdb.org.
Click on photo to resize in browser. Scroll down to see metadata.
Photographer: Joel Seewald
Taken: October 20, 2018
Caption:
Middle Image | Additional Description: The hydroelectric station under construction, viewed from the south. The water tank interacts with water flow from Moore Lake, two-thirds of a mile to the north, through the building's two generators. The water tank determined the vertical shape of the building. Photo from the collection of The Henry Ford.
Submitted: October 23, 2018, by Joel Seewald of Madison Heights, Michigan.
Database Locator Identification Number: p450927
File Size: 2.724 Megabytes
To see the metadata that may be embedded in this photo, sign in and then return to this page.