Caption:
Marker detail: Footbridge Construction (1) | Additional Description:
Construction of the bridge began early in 1935. On each side of the river, working platforms were chipped out of the rock and scaffolding was lowered into place from Table Rock.Submitted: December 3, 2019, by Cosmos Mariner of Cape Canaveral, Florida.