Photograph as originally submitted to this page in the Historical Marker Database www.HMdb.org. Click on photo to resize in browser. Scroll down to see metadata.
Marker detail: Footbridge Construction (1)

Caption: Marker detail: Footbridge Construction (1)
Additional Description:
Construction of the bridge began early in 1935. On each side of the river, working platforms were chipped out of the rock and scaffolding was lowered into place from Table Rock.

Submitted: December 3, 2019, by Cosmos Mariner of Cape Canaveral, Florida.
Database Locator Identification Number: p504394
File Size: 1.312 Megabytes

To see the metadata that may be embedded in this photo, sign in and then return to this page.