Marker Logo
THE HISTORICAL
MARKER DATABASE
“Bite-Size Bits of Local, National, and Global History”
 
 
 
 
 
 
6 entries match your criteria.  

 
 

Related Historical Markers

 
By cmh2315fl via Flickr (CC BY-NC 2.0), July 30, 2011
Joliet Vertical Lift Railroad Bridge
SHOWN IN SOURCE-SPECIFIED ORDER
1 Illinois, Will County, Joliet — Joliet Lift Bridges
On West Jefferson Street (U.S. 30) 0.1 miles east of North Bluff Street, on the right when traveling east.
Outside of Chicago, Jollet has the largest number of operable lift bridges in the Midwest. The six bridges, built circa 1930, represent three of only four design styles of lift bridges made in the world. The black railroad bridge is a vertical . . . Map (db m198528) HM
2 Illinois, Will County, Joliet — McDonough Street Bridge
On McDonough Street/Hiawatha Pioneer Trail (U.S. 52) 0.1 miles east of Grand Army of the Republic Highway (U.S. 6), on the right when traveling east.
Built 1933 by the State of IllinoisMap (db m198529) HM
3 Illinois, Will County, Joliet — Jefferson Street Bridge
On West Jefferson Street (U.S. 30) 0.1 miles east of North Bluff Street, on the right when traveling east.
Built 1932 by the State of IllinoisMap (db m198526) HM
4 Illinois, Will County, Joliet — Cass Street Bridge
On Lincoln Highway (U.S. 30) west of North Joliet Street, on the left when traveling west.
Built 1932 by the State of IllinoisMap (db m198523) HM
5 Illinois, Will County, Joliet — Jackson Street Bridge
On W Jackson Street east of North Bluff Street, on the right when traveling east.
Built 1932 by the State of Illinois and the City of JolietMap (db m198512) HM
6 Illinois, Will County, Joliet — Ruby Street Bridge
On Ruby Street (State Highway 53) west of North Chicago Street (State Highway 53), on the right when traveling west.
Built 1935–by the State of IllinoisMap (db m198511) HM
 
 
CeraNet Cloud Computing sponsors the Historical Marker Database.
This website earns income from purchases you make after using our links to Amazon.com. We appreciate your support.
Paid Advertisement
Aug. 27, 2026