The Auburn and Rochester Railroad began operating through this area in 1841 as part of the first Albany to Buffalo rail system and was later consolidated into the mighty New York Central System as the Auburn Branch. This passenger station, the . . . — — Map (db m280796) HM
1821-1901. Founded water-cure co. here ca. 1850 offering sulphur water treatments to heal mind, body and spirit. Sanitarium constructed 1896. — — Map (db m255810) HM
The original Peirce Pavilion was constructed in 1880 on the North East corner of Main and Spring Streets surrounding a major sulphur spring. It was these sulphur springs that made the growth of Clifton Springs Sanitarium possible and which in turn . . . — — Map (db m64949) HM