Hurricane in Washington County, Utah — The American Mountains (Southwest)
 

The Hurricane Canal: A Feat of Necessity

 
 
The Hurricane Canal: A Feat of Necessity Marker image. Click for full size.
Photographed by Tom Bosse, July 22, 2024
1. The Hurricane Canal: A Feat of Necessity Marker
Inscription.
The Hurricane Canal runs from the dam on the Virgin River at the Narrows, to where it leaves the Hurricane Cliffs and flows through the fields located on the Hurricane Bench (a distance of approximately 6.5 miles), and to the town of Hurricane.

History

The Hurricane Canal begins at a diversion dam constructed on the Virgin River at a place known as the Narrows. The dam is a combination of existing river boulders and infill boulders that were placed without mortar. The dam was washed out twice before successfully withstanding floods and high waters. Later concrete was poured to help stabilize the dam.

The canal follows along the south side of the Virgin River in a westerly direction running along the face of the Virgin River Canyon walls for a distance of approximately three and one-half miles. It then leaves the canyon and turns south along the west slope of the Hurricane cliffs for a distance of approximately three miles where it leaves the cliffs turning west to provide water for the fields located on the Hurricane Bench.

The pioneers blasted a total of twelve tunnels and constructed six wooden flumes, most
Paid Advertisement
Click or scan to see
this page online
of which have been replaced by metal flumes. The canal is laid out on a twelve foot wide shelf of conglomerate and lime rock, and in one place gypsum. The inside dimensions of the canal are eight feet wide and four feet deep. Frequent floods and landslides have washed out portions of the canal, but it is kept in good repair. A rider makes regular trips along the canal to inspect for breaks and carry out maintenance work.

As the canal flowed past the town along the Hurricane cliffs it provided water for part of the community as ten cisterns were located along the canal to collect and hold water. With the completion of a more modern water system, the ten cisterns were abandoned.

The canal still follows the same course as when first completed in 1904. Located high above the Virgin River the canal can be followed on foot in many sections only with difficulty and the exercise of extreme caution. The narrow trail and sheer drops to the canyon bottom limits access to the canal.

The construction of the Hurricane Canal is one of early Utah’s proudest stories of pioneer determination. Built completely by hand, the 7.5 mile canal clings
The Hurricane Canal: A Feat of Necessity Marker image. Click for full size.
Photographed by Tom Bosse, July 22, 2024
2. The Hurricane Canal: A Feat of Necessity Marker
to the sheer walls of the Virgin River Canyon before leaving to follow the Hurricane Fault and then encircle the flat farmlands of the Hurricane Bench. The canal took eleven years and $60,000 to build, most of the capital being represented by the labor of men who paid for their shares in the canal company by working on the canal during the winter months. The completed canal brought water to 2000 acres of parched bench land and created the now successful village of Hurricane, Utah.

Construction

Every reporter and historian who has visited the canyon of the Virgin River and the canal site comments on the impossibility of appreciating the difficulty of the undertaking. The steep canyon walls are chiefly lime rock and conglomerate which would often slide down the sides of the canyon after excavation was begun, burying the canal route under additional tons of cover. In other places fills had to be made with loose rock or a flume on trestle-work built across the opening or gap. There was no road into the canyon during the first year so all materials for canal and dam construction, as well as tools, bedding and food had to be carried
The Hurricane Canal: A Feat of Necessity Marker image. Click for full size.
Photographed by Tom Bosse, July 22, 2024
3. The Hurricane Canal: A Feat of Necessity Marker
by hand.

Most of the work was done between November and May when farm chores were less demanding. Workers camped at the construction site and transients were often put to work for their board. Construction tools were quite simple. Except for a short distance near the dam, it was not possible to use horse teams with plows and scrapers so most of the work had to be done by hand. Wheelbarrows, picks, shovels, crowbars, and hand-driven drills were the basic tools in the construction of the 12-foot grade or bed for the canal which was 8 feet wide and 4 feet deep.

Canal company shareholders built the canal by the contract or piecework method. The working survey marked off the route in 4-rod lengths, then carefully estimated the cost of construction for each length. These lengths or stations were taken up by stockholders working out their stock payments at $2.00 per day. The survey estimates allowed 15 cents per cubic yard for earth excavation, 75 cents per loose rock and gravel, and $1.25 for solid rock. When workers could demonstrate that the estimates were incorrect, adjustments were made.

Building the dam turned out to be much
Paid Advertisement
more difficult than originally anticipated. Specifications called for a structure seventy-five feet in thickness up and down the river, and five feet higher than the bottom of the canal. The river is about forty feet wide at the place called the Narrows where the dam was built. The sides and bottom of the river are solid rock, the north side was a solid limestone cliff over 100 feet high and on the south was a rock that rose nine feet to a shelf above the river. The site was ideal for a dam, but inexperience with construction and raging floods of the Virgin led to several disappointments.

The plan was to use the shelf on the south side for a spillway and during the winter of 1893-1894 huge rocks were blasted from the sides of the canyon and dropped into place as an anchor. Smaller rocks were then used to fill in and complete the dam. The finished structure looked sturdy enough and the canal company paid the Isom Company $1150.00 for its work. About a year later flood water came surging out of the Narrows, picked up the dam and left huge boulders strung along the river below the dam site.

For its second attempt the company secured a big pine log from the Kolob Mountains north of the Virgin and laid it across the river by setting one end into a hole in the limestone cliff and the other into a slot cut into the south shelf. Juniper posts were then laid with their butts on the log and their tops upstream in the river and the whole mass weighted down with rocks. This dam held for about a year until another flood lifted the log and its load of juniper posts and rock out of its mountings and carried the timber downstream.

The third time proved the charm. The pine log was recovered and put back in its slots and junipers again placed with their tops upstream. This time two layers of rocks were placed on the juniper logs and then the whole mass was woven together with heavy galvanized wire. The dam held. It had taken about six years and three attempts, but there was now water available for the canal to carry.

If the dam was difficult, the canal was only more so. Carving a twelve foot bed out of solid limestone or loose conglomerate was hard and dangerous work. Time dragged on and work progressed slowly. Landslides wiped out moths and even years of work, tunnels had to be blasted through solid rock, flumes on trestle work were built to span open spaces like Chinatown Wash. Winter after winter passed and still the canal remained uncompleted. Discouragement began to overtake the workers until by 1901 only seven or eight men were still working on the canal. As progress came to a standstill, the canal board realized it must find the cash necessary to supply construction needs or work would stop altogether.

Stockholders had considered asking the L.D.S. Church for help as early as 1898, but four more years of effort passed before the canal company decided the assistance was essential. Finally, in 1902 James Jepson, one of the originators of the canal, went to Salt Lake City for an audience with Church President Joseph F. Smith. After a brief but determined exchange between Jepson and Smith, Jepson returned home with the $5,000 cash the canal company needed.

The stimulus of the Mormon Church support and the $5,000 cash were sufficient to renew the spirit and the treasury of the company and work again went ahead. On August 6, 1904, eleven years after the canal was begun, water flowed over the dam spillway, through the canal and onto the Hurricane Bench.

[Caption]: Canal with Rock Cribbing (circa 1972)

[Caption]: Blackpoint Tunnel &n Trestle on the Hurricane Canal

[Caption]: Hurricane Canal Workers in Camp. Contributed on January 12, 2012 by the Dixie State College.

[Caption]: Men Standing Next to the Hurricane Canal. Taken in 1899 by James H. Crockwell (1855-1940) of Salt Lake City.

All images sourced from the Washington County Historical Society: http://wchsutah.org/water/hurricane-canal.php
 
Erected by Rotary International, Hurricane Valley Chapter Sons of Utah Pioneers, Lions International.
 
Topics and series. This historical marker is listed in this topic list: Man-Made Features. In addition, it is included in the Rotary International, and the Sons of Utah Pioneers series lists. A significant historical date for this entry is January 12, 2012.
 
Location. 37° 10.612′ N, 113° 17.07′ W. Marker is in Hurricane, Utah, in Washington County. It is on North 200 E, on the left when traveling north. Touch for map. Marker is in this post office area: Hurricane UT 84737, United States of America. Touch for directions.

Regionally, this marker is in Utah’s Color Country. It is also in the American Southwest, in the Mountain West, and in Colorado Plateau. Globally, it is in North America, the Rocky Mountains, the Western Hemisphere, the Western World, and the Anglosphere. Historically, it finds itself in what was once New Spain and also Mexico’s Alta California.

Other nearby markers. At least 8 other markers are within walking distance of this marker: The History of Hurricane Valley (here, next to this marker); Hurricane Canal Replica (a few steps from this marker); Early Pioneer Granary and Home (approx. 0.2 miles away); Pioneer Hay Barn, Manger, and Corral (approx. 0.2 miles away); Threshing Machine (approx. 0.2 miles away); Shetlar Wagon (approx. 0.2 miles away); Spencer and Helen Isom "Home" (approx. 0.2 miles away); Grain Reaper (approx. 0.2 miles away). Touch for a list and map of all markers in Hurricane.
 
 
Credits. This page was last revised on August 31, 2024. It was originally submitted on August 31, 2024, by Tom Bosse of Jefferson City, Tennessee. This page has been viewed 217 times since then and 17 times this year. Photos:   1, 2, 3. submitted on August 31, 2024, by Tom Bosse of Jefferson City, Tennessee. • Andrew Ruppenstein was the editor who published this page.
m=255613

CeraNet Cloud Computing sponsors the Historical Marker Database.
This website earns income from purchases you make after using our links to Amazon.com. We appreciate your support.
Paid Advertisement
Jul. 24, 2026