Boggs Township near Holters Crossing in Centre County, Pennsylvania — The American Northeast (Mid-Atlantic)
Bald Eagle and Spring Creek Navigation Canal Lock 11
1839 - 1865
Inscription.
IN APRIL 1834, ROLAND CURTIN joined a dozen other Centre County businessmen-including fellow ironmasters James Irvin, Joseph Miles, William Thomas, and Bond Valentine-in organizing the Bald Eagle and Spring Creek Navigation Company (BE&SCN). The firm was authorized by the Pennsylvania Legislature to create a navigable water route of canals and slackwater pools (impounded bodies of still water) extending from the Centre County seat at Bellefonte 25 miles northeastward to a connection with the West Branch Pennsylvania Canal near the new logging town of Lock Haven, Clinton County. The firm's name reflected its plan to place this "Navigation" in and alongside the Bald Eagle Creek and its Spring Creek tributary. The Navigation's connection to the West Branch Pennsylvania Canal would be made by the four-mile-long Bald Eagle Cross-Cut Canal being built by the State westward from Lock Haven-the latest extension of the Commonwealth's Main Line of Public Works.
A plan of the BE&SCN drawn up by engineer Mathew Stealey in 1835 (right) called for 22 "lift locks" to raise and lower boats an average of 8 feet per lock in order to overcome an elevation change of 187 feet between Bellefonte and a new State-built dam at the western end of the Bald Eagle Cross-Cut Canal. Stealey's plan also called for placing six no-lift "guard locks" at stream crossings and feeder entrances to canals, to protect the canals from damage during high water, and to provide a means of supplying them with creek-water as necessary. All locks were to match those being built on the West Branch Pennsylvania Canal: 90 feet long, 17 feet wide in the chamber, composed of cut stone lined with wood planks to shield the lock walls as well as vessels using the locks. Canals were to be four feet deep, 20 feet wide at the bottom, 36 feet across at the top, with banks rising six feet above the water level. Towpaths built atop the banks for use by boat-pulling horses and mules were to be nine feet wide.
Contracts for constructing the BE&SCN were awarded in the fall of 1835. The 25-mile route was divided into halves for construction purposes: a Lower Division, extending from the Cross-Cut Canal north of Flemington upstream and along Bald Eagle Creek to the Howard
Furnace (five miles northeast
of Eagle Iron Works); and an Upper Division,
extending from Howard to Bellefonte, the final two
miles paralleling Spring Creek. The Lower Division
was completed in 1837, the same year a financial
"panic" plunged the nation into a decade-long
economic depression. Work on the Upper Division
continued in fits and starts, as funding permitted.
To Roland Curtin's satisfaction, the 6.5-mile stretch
between Howard Furnace and Eagle Iron Works-entailing construction of seven lift locks and two
guard locks-was completed by the fall of 1839.
The opening of that section was a boon for Roland's
enterprise, greatly facilitating transportation of
materials, products, and people in and out of Eagle
Iron plantation.
The remaining six miles of the BE&SCN, extending to Bellefonte, were not completed until 1848.
The first canal boat to travel the length of the BE&SCN-the George Crane-arrived in Bellefonte on September 1, 1848, carrying jubilant BE&SCN managers and other dignitaries. By some accounts, the boat had paused the previous day at Eagle Iron Works to deliver a piano manufactured in Philadelphia
and
destined to grace a parlor in the Curtin Mansion. A
second boat arrived in Bellefonte the following day. It
was either a "work boat or a "packet boat (designed
for transporting passengers, mail, and merchandise)
"from Eagle Works, named Jane Curtin in honor of
Roland Curtin's wife.
Materials and products floated over the BE&SCN during its first years of operation included pig iron, bar iron (wrought iron), charcoal, bituminous coal, coke, plaster, salt, flour, whiskey, rye, corn, oats, wood, fire-brick, iron ore, lime, and all manner of merchandise. People could book passage on canal boats; if a packet boat was not available-and few such vessels plied the BE&SCN-travelers could ride in the captain's quarters of a standard boat, or make themselves comfortable on the cargo-laden deck.
Severe flooding in the spring of 1865 extensively damaged BE&SCN's locks, dams, and canal banks. Facing stiff competition from the Bald Eagle Valley Railroad-opened the previous December between Lock Haven and Tyrone, Blair County-BE&SCN managers could not justify the great expense of restoring the Navigation. The battered system was abandoned, except for a few miles of its eastern end.
Eagle Iron Works officials eventually installed a turbine (a bladed wheel turned by water movement) in the depths of vacated Lock 11. Shielded from weather, and nearly impervious to drought, the submerged turbine replaced the antique water wheel system of blast generation, proving much more reliable in powering bellows in the blast house and bloomeries in the forge during the Works' final decades in operation.
BE&SCN Lock 11, whose remains now rest beside the Eagle Iron Works blast house, was designed for raising and lowering boats 7Ύ feet. Attached to either end of its chamber was a pair of hinged wooden gates fitted with wicket valves and sturdy arms. By opening and closing the gates and valves, a lock operator could allow water from the higher, upstream canal level to gradually fill the chamber (lifting a boat), or water within the filled chamber to slowly drain into the downstream canal level (lowering a boat). Boatmen were responsible for "tending" the locks through which their vessels passed; in a cost-saving measure, the BE&SCN Company declined to hire and house locktenders.
[Illustration captions, clockwise from the top center map, read]
On a map of the planned Bald Eagle and Spring Creek Navigation, drafted by engineer Mathew R. Stealey in 1835, the proposed chain of canals and slackwater pools-extending 25 miles from Bellefonte northeastward to the western end of the Bald Eagle Cross-Cut Canal near Flemington-is marked in red. The four-mile-long Cross-Cut Canal, connecting to the West Branch Pennsylvania Canal in Lock Haven, is highlighted in pink.
ABOVE: Passengers enjoy fresh air and views of the countryside aboard a packet boat. From a mid-1800s painting by Edward Lamson Henry.
BELOW: A pair of mules tows a canal boat on an unidentified Pennsylvania canal at the turn of the twentieth century (colorized).
LEFT: A lock on the West Branch Pennsylvania Canal near Watsontown, Northumberland County.
RIGHT: Costumed interpreters negotiate a lock on the Chesapeake and Ohio Canal National Historical Park in Maryland.
RIGHT: The route of the Bald Eagle and Spring Creek Navigation through Eagle Iron Works is drawn in red on a detail of Stealey's 1835 map. Lock locations are highlighted in yellow. Major components of the Works are labeled.
RIGHT: A diorama on display at the Thomas T. Taber Museum in Williamsport, Pa., shows a canal boat rising with the water level in a lift lock similar to Lock 11. No photos or contemporary depictions of canal operations in or around Eagle Iron Works have been discovered.
Erected by Roland Curtin Foundation, Happy Valley Adventure Bureau, Centre County Commissioners, and PHMC.
Topics. This historical marker is listed in these topic lists: Industry & Commerce • Settlements & Settlers • Waterways & Vessels. A significant historical month for this entry is April 1834.
Location. 40° 58.453′ N, 77° 44.474′ W. Marker is near Holters Crossing, Pennsylvania, in Centre County. It is in Boggs Township. It is on Curtin Road (Pennsylvania Route 1003) 0.1 miles south of Eagle Valley Road ( Route 150), on the left when traveling south. Marker is on the Eagle Iron Works and Curtin Village grounds. Touch for map. Marker is at or near this postal address: 251 Curtin Road, Howard PA 16841, United States of America. Touch for directions.
Regionally, this marker is in the Pennsylvania Wilds. It is also in the American Northeast, in the Mid-Atlantic, in Appalachia, and specifically in Northern Appalachia. Globally, it is in North America, the Western Hemisphere, the Western World, and the Anglosphere. Historically, it finds itself in what was once the Haudenosaunee (Iroquois) Confederacy and also one of the original Thirteen Colonies.
Other nearby markers. At least 8 other markers are within 4 miles of this marker, measured as the crow flies: Workers Village (here, next to this marker); Eagle Iron Works (here, next to this marker); Last Charcoal Iron (a few steps from this marker); Eagle Iron Works and Curtin Village (about 500 feet away, measured in a direct line); Curtin Mansion (about 600 feet away); Site of Curtin Station, Bald Eagle Valley Railroad (about 800 feet away); Eagle Ironworks (approx. 0.2 miles away); War Memorial (approx. 3.2 miles away). Touch for a list and map of all markers in Holters Crossing.
Also see . . .
1. Bald Eagle and Spring Creek Navigation Company (Centre County Encyclopedia of History & Culture). (Submitted on June 12, 2025, by William Fischer, Jr. of Reynoldsburg, Ohio.)
2. Eagle Iron Works and Curtin Village. (Submitted on June 12, 2025, by William Fischer, Jr. of Reynoldsburg, Ohio.)
Credits. This page was last revised on June 12, 2025. It was originally submitted on June 12, 2025, by William Fischer, Jr. of Reynoldsburg, Ohio. This page has been viewed 199 times since then and 30 times this year. Photos: 1, 2, 3. submitted on June 12, 2025, by William Fischer, Jr. of Reynoldsburg, Ohio.