Marker Logo
THE HISTORICAL
MARKER DATABASE
“Bite-Size Bits of Local, National, and Global History”
Near Preston in Caroline County, Maryland — The American Northeast (Mid-Atlantic)
 

Dover Crossing Timeline

 
 
Dover Crossing Timeline Marker image. Click for full size.
Photographed by Devry Becker Jones (CC0), June 3, 2022
1. Dover Crossing Timeline Marker
Inscription.
1760
1760:
Talbot County resident Deborah Nichols is licensed to operate a ferry near the lost town of Dover. Women often took over the ferry operator position from their husbands when the men passed away.

1765: Caroline County resident Henry Troth begins operating a second ferry north of the Dover Ferry's crossing by constructing a causeway through the marsh.

1786: The Dover Ferry's route is transferred north to Troth's crossing and no longer operates from Barkers Landing near Dover.

1800
1810 - 1811:
The first Dover Bridge is built. It is 1200-feet long, on oak piles with a pine deck and railing and a 50-foot wide draw.

1860 - 1861: Caroline and Talbot Counties appropriate funds for a new Dover Bridge for $8, 540.83.

1898: After decades of disruptive repairs, a three-span iron bridge replaced the second Dover Bridge.

1900
1900:
The Dover Bridge's wooden draw is destroyed when a traction engine crashes through the bridge and sinks to the bottom of the Choptank River. A boat is built to temporarily transport wagons and horses across the river.

1909: Talbot and Caroline County Commissioners announce plans to rebuild the Dover Bridge
Paid Advertisement
Click or scan to see
this page online
yet again.

1912: The Counties construct a 515-long iron truss bridge as the fourth Dover Bridge.

1931: The State Roads Commission appropriates funds to rebuild the Eastern Shore's unsafe and narrow bridges, including the Dover Bridge. This region is now heavily reliant on automobile transportation for shipping agricultural products and seafood to markets.

1933: The fifth Dover Bridge is finished. The structure's rare design combines elements of both a movable swing span and a metal Warren truss bridge.

2000
2017:
The sixth Dover Bridge is a high-level fixed-span that will not disrupt either automobile or boat traffic. The SHA, the successor of the State Roads Commission, preserves the 1933 swing-truss bridge in place because of its historic engineering significance.
 
Erected by State Highway Administration.
 
Topics. This historical marker is listed in these topic lists: AgricultureBridges & ViaductsIndustry & CommerceRoads & VehiclesWaterways & VesselsWomen. A significant historical year for this entry is 1760.
 
Location. 38° 45.37′ N, 75° 59.721′ W. Marker is near Preston, Maryland, in Caroline County. It is on Dover Bridge Road (Maryland Route 331
Dover Crossing Timeline Marker image. Click for full size.
Photographed by Devry Becker Jones (CC0), June 3, 2022
2. Dover Crossing Timeline Marker
) 0.8 miles west of Carr's Creek Lane, on the right when traveling west. Touch for map. Marker is in this post office area: Preston MD 21655, United States of America. Touch for directions.

Regionally, this marker is on the Eastern Shore. It is also in the American Mid-Atlantic, on the Delmarva Peninsula, and in the Tidewater. Globally, it is in the North Atlantic Region, North America, the Western Hemisphere, the Western World, and the Anglosphere. Historically, it finds itself in what was once one of the original Thirteen Colonies and also the Antebellum South.

Other nearby markers. At least 8 other markers are within 5 miles of this marker, measured as the crow flies: The Dover Bridge (here, next to this marker); Peachblossom Meetinghouse (approx. 4.2 miles away); Archaeology at the Bethel African Methodist Episcopal Church (approx. 4.3 miles away); Third Haven (approx. 4.4 miles away); The Bullitt House (approx. 4.4 miles away); Easton's Fire Bell (approx. 4½ miles away); Mt. Pleasant M. E. Church (approx. 4½ miles away); Mt. Pleasant Cemetery (approx. 4½ miles away). Touch for a list and map of all markers in Preston.
 
The modern Dover Bridge image. Click for full size.
Photographed by Devry Becker Jones (CC0), June 3, 2022
3. The modern Dover Bridge
 
 
Credits. This page was last revised on June 4, 2022. It was originally submitted on June 4, 2022, by Devry Becker Jones of Washington, District of Columbia. This page has been viewed 794 times since then and 20 times this year. Photos:   1, 2, 3. submitted on June 4, 2022, by Devry Becker Jones of Washington, District of Columbia.
m=199288

CeraNet Cloud Computing sponsors the Historical Marker Database.
This website earns income from purchases you make after using our links to Amazon.com. We appreciate your support.
Paid Advertisement
Jun. 11, 2026